C11 · Lesson 3 · Calibration and uncertainty budgets
Where an instrument's accuracy comes from, and how to add it up
A meter's reading is only as good as the chain of comparisons behind it: the meter was checked against a calibrator, the calibrator against a lab standard, and so on up to a national laboratory. Each link adds uncertainty. An uncertainty budget lists every source, converts each to a standard uncertainty, and combines them. And when a reading sits near a specification limit, the budget decides whether "pass" can honestly be claimed.
- The curve is the probability that a part's true value is beyond the limit, given a reading x standard uncertainties inside it (Gaussian errors).
- A reading right at the limit is a coin toss: 50%. One standard uncertainty inside, 16%; two, 2.3%.
- The guard band g is how far inside the limit a reading must be to be accepted. The readout is the worst-case chance of accepting a bad part at that edge.
Predict
A specification limit is 10.00 V. The measurement's expanded uncertainty is 0.02 V (k = 2, so u = 0.01 V). A part reads 9.99 V. Can it be accepted?
Not with confidence. 9.99 V is one standard uncertainty inside the limit, and a Gaussian error puts 16% of its probability beyond one σ on that side. A common rule is to guard-band by the expanded uncertainty: accept only readings below 9.98 V, where the risk falls to 2.3%.
Name it
Traceability
A measurement is traceable when it's linked to the SI units through an unbroken chain of calibrations, each with a stated uncertainty. A calibration certificate gives the instrument's error at test points and the uncertainty of that determination.
Standard uncertainties
Every source is converted to a standard uncertainty u, one standard deviation:
| Source | Standard uncertainty |
|---|---|
| repeated readings (type A) | |
| a specification or resolution, ±a, any value equally likely | (rectangular) |
| ±a, values near the center more likely | (triangular) |
| a certificate's expanded uncertainty U at coverage k | U/k |
The budget
With sensitivity coefficients for each input,
with k = 2 for about 95% coverage. The largest few terms dominate; listing them shows where improvement pays.
Using the result
The test uncertainty ratio, the tolerance being checked divided by U, should be at least 4. Guard banding shrinks the acceptance limits by a multiple of u, trading a few good parts rejected for fewer bad ones accepted.
Worked example
A voltage measurement has these contributions, all in % of reading: the meter's specification ±0.02% (rectangular); its calibration certificate, U = 0.005% at k = 2; resolution ±0.0005% (rectangular); and ten readings with s = 0.003%. What are and U?
Show the solution
- Rectangular terms. The specification and the resolution are half-widths, so each is divided by :
- Certificate. Its U is at k = 2:
- Scatter of ten readings.
- Combine in quadrature. so
- Expand with k = 2.
- What dominates. The meter's specification is 95% of the variance: averaging more readings would change nothing.
Answer = 0.0119% and U = 0.024% (k = 2), nearly all of it from the meter's specification.
Worked example
A resistor's tolerance of ±1% is checked with a measurement whose expanded uncertainty is 0.2%. Is the test uncertainty ratio adequate?
Show the solution
- Test uncertainty ratio. That's above the usual minimum of 4.
- With a poorer measurement. With a 0.5% measurement uncertainty it would be 2, and parts near the tolerance limits could not be reliably sorted without a wide guard band.
Answer yes: the TUR is 5, above the usual minimum of 4.
Worked example
With guard bands of 1u and 2u inside a limit, what is the worst-case probability of accepting a part whose true value is out of tolerance?
Show the solution
- Risk at the guard-band edge. A part accepted right at the edge has its true value beyond the limit with probability
- Guard band of 1u.
- Guard band of 2u.
- The average risk. Most accepted parts are far from the edge, so the average risk is much lower; the guard band bounds the worst case.
Answer at worst 15.9% with a 1u guard band, and 2.3% with 2u.
Check
A specification is ±0.5 (rectangular), and a certificate quotes U = 0.02 at k = 3.
(a)
What standard uncertainty does the specification contribute?
(b)
And the certificate?
Check
A budget has standard uncertainties 0.01, 0.004 and 0.01; the first has sensitivity coefficient 2, the others 1.
(a)
What is the combined standard uncertainty?
(b)
What is the expanded uncertainty at k = 2?
Check
A tolerance of ±1% is checked with an expanded uncertainty of 0.1%.
(a)
What is the test uncertainty ratio?
(b)
Does it meet the 4:1 rule (1 for yes)?
Check
An upper limit is 5, the standard uncertainty 0.005, and the guard band 3u.
(a)
Below what reading are parts accepted?
(b)
What is the worst-case chance an accepted part is out of tolerance?
Check
A quantity is equally likely anywhere in [−a, a].
Step 1
What is its variance, ?
Type it the way you would write it, like 3sin(2πft) or 3*sin(2*pi*f*t). Angles can be in radians or carry a degree sign, like 45°.
Step 2
What is its standard uncertainty?
Check
What makes a measurement traceable?
Explain why
Why do uncertainty budgets add contributions in quadrature rather than simply summing them?
Independent errors don't all push in the same direction at the same time. If each source is a random quantity with its own standard deviation, the variance of their sum is the sum of their variances, so standard deviations combine as the square root of the sum of squares. Adding them linearly would assume every error is at its worst and in the same direction at once, which is possible but very unlikely, and would overstate the uncertainty badly with many terms. Quadrature also explains why the largest term dominates: a contribution a third the size of the biggest adds only about 5% to the total.
Practice
Keep practicing
7 kinds of problem on this topic, dealt one at a time with new numbers every time, for as long as you like.