D1 · Lesson 8 · Storage and the duck curve
Net load after solar generation and the midday dip and evening ramp it creates, ramp rates, energy storage rated in both power and energy, duration and round-trip efficiency, and using batteries to shift solar energy into the evening
On a sunny spring day in a solar-heavy grid, the demand that conventional plants must meet, load minus solar, sags to a deep minimum at midday and then climbs steeply as the sun sets and people come home. Plotted over a day, that net load looks like the outline of a duck, and its evening "neck" is the hardest few hours of the grid's day: generators must ramp up by many gigawatts in a few hours. Batteries that charge from the midday surplus and discharge into the evening ramp flatten the duck.
- A simplified daily load, peaking at 25 GW in the early evening, minus solar generation that rises from 6:00 to a noon peak and falls to zero at 18:00.
- More solar deepens the midday dip and steepens the evening ramp, the neck of the duck.
- The readouts show the noon minimum and the average ramp from 15:00 to 19:00 that other generators must follow.
Predict
A battery is rated 100 MW and 400 MWh, with 88% round-trip efficiency. How long can it discharge at full power, and how much energy does it return per full charge?
Duration is energy over power: 400 MWh/100 MW = 4 h, a common size for evening peaks. With 88% round-trip efficiency, 400 MWh drawn from the grid to charge it comes back as 352 MWh. Power rating sets how fast it can respond; energy rating sets how long.
Name it
Net load and the duck curve
Net load is demand minus variable renewable output: what dispatchable generators and storage must supply. With large solar output it dips at midday and rises steeply in the evening. Two numbers matter: the minimum (plants may have to shut down or curtail solar) and the ramp rate (GW per hour that other sources must follow).
Storage ratings
Storage is rated in power (MW) and energy (MWh); their ratio is the duration. Round-trip efficiency is energy out over energy in: about 85 to 90% for lithium-ion batteries, 70 to 80% for pumped hydro. Energy delivered to the grid from a battery that must supply P for t hours is Pt; the energy it must have absorbed is .
Other tools
Demand response (shifting flexible loads like water heating and EV charging to midday), curtailing some solar, faster-ramping plants, and wider-area transmission all flatten the duck too.
Worked example
In the sim with 15 GW of solar, what's the noon net load and the average 15:00–19:00 ramp?
Show the solution
- Noon net load. The load is 20 GW and solar 15 GW:
- The ramp. At 15:00 net load is 12.9 GW and at 19:00 it's 24.8 GW: in 4 hours.
- Average rate. which other plants and storage must follow.
Answer the noon net load is 5 GW, and the average 15:00 to 19:00 ramp is about 3.0 GW/h.
Worked example
A 100 MW, 400 MWh battery has 85% round-trip efficiency. How long can it discharge at full power, and how much energy must it take in to deliver its full 400 MWh?
Show the solution
- Discharge time. 400 MWh at 100 MW lasts 4 hours.
- Energy taken in.
- Where the rest goes. The other 71 MWh becomes heat in charging, discharging and conversion.
Answer it discharges for 4 hours at full power, and it must take in 471 MWh to deliver 400 MWh.
Worked example
A pumped-hydro plant lifts 1 million m³ of water through 300 m. How much energy does the upper reservoir hold, and how much comes back at 80% round-trip efficiency?
Show the solution
- Stored energy. which is 818 MWh.
- Energy returned. At 80% round-trip efficiency, about 650 MWh comes back.
- Why it's common. Pumped hydro is most of the world's grid storage, because a reservoir is cheap per megawatt-hour.
Answer the reservoir holds J (818 MWh), and about 650 MWh comes back.
Check
A battery is rated 50 MW and 400 MWh. How long can it discharge at full power?
Check
A storage plant with 0.75 round-trip efficiency is charged with 100 MWh. How much does it return?
Write units the way you normally would: 1.5 MWh, 1500 kWh and 0.0015 GWh are the same answer.
Check
Net load rises from 12 GW to 20 GW over 5 hours. What's the average ramp rate?
Write units the way you normally would: 1.5 GW/h, 1500 MW/h and 0.0015 TW/h are the same answer.
Check
A battery must deliver 50 MW for 2 hours each evening, with round-trip efficiency 0.9. How much energy must it absorb from midday solar?
Write units the way you normally would: 1.5 MWh, 1500 kWh and 0.0015 GWh are the same answer.
Check
A battery is rated 100 MW for 2 hours, with 90% round-trip efficiency.
(a)
What energy does it deliver?
Write units the way you normally would: 1.5 MWh, 1500 kWh and 0.0015 GWh are the same answer.
(b)
What must it take in to deliver that?
Check
A pumped-hydro reservoir holds 5 million m³ at 100 m above the lower one, with 80% round-trip efficiency.
(a)
How much energy is stored?
Write units the way you normally would: 1.5 MWh, 1500 kWh and 0.0015 GWh are the same answer.
(b)
How much comes back?
Explain why
Why does adding solar power make the evening ramp steeper?
Solar generation peaks at midday and falls to zero around sunset, while household demand typically peaks in the early evening. Subtracting solar from demand gives the net load that other sources must meet, so every additional gigawatt of solar deepens the midday dip without changing the evening peak, after the sun has set. The net load must therefore climb from a lower midday minimum to the same evening peak in the few hours as the sun goes down, a steeper ramp that conventional plants must follow. Storage charged from the midday surplus and discharged in the evening fills in the dip and cuts the ramp.
Practice
Keep practicing
9 kinds of problem on this topic, dealt one at a time with new numbers every time, for as long as you like.