title: "Problem set 11: power system design problems"
heading: "Problem set 11: choosing a transmission voltage, correcting power factor, sizing series and shunt compensation, limiting fault levels, rating breakers, setting relays, detuning capacitor banks, regulating feeders and sizing fast frequency response"
eyebrow: S10 · Problem set 11
type: problems
---

::: hook
Each problem here is a small design decision of the kind a transmission or distribution engineer makes: a voltage, a rating, a setting or a size, worked from the requirement to a number you could put in a specification.
:::

::: pool
pick: 12

::: check
kind: parts
given: P = 200 | 500 | 1000; R = 0.05 | 0.03; l = 100 | 300; x = 2 | 3; f = 0.95 | 1

## A {P} MW load at power factor {f} is to be supplied over {l} km of line with {R} Ω/km per phase, losing at most {x}%.

::: part
answer: sqrt(P*1e6*R*l/(x/100*f^2))/1e3
unit: kV
tolerance: 0.5%

### What is the lowest line voltage that meets the loss limit?

::: misses
- [any] Loss fraction $= PR/(V^2\cos^2\phi)$.
:::
:::
:::

::: check
kind: parts
given: P = 5 | 20 | 50; a = 0.7 | 0.8; b = 0.95 | 0.98

## A {P} MW plant at power factor {a} is to be corrected to {b}.

::: part
answer: P*(sqrt(1 - a^2)/a - sqrt(1 - b^2)/b)
unit: Mvar
tolerance: 0.5%

### How large a capacitor bank?

::: misses
- [any] $P(\tan\phi_1 - \tan\phi_2)$.
:::
:::

::: part
answer: (1 - a/b)*100
unit: %
tolerance: 0.5%

### By how much does the supply current fall?

::: misses
- [any] Current goes as $1/\cos\phi$.
:::
:::
:::

::: check
kind: parts
given: X = 0.4 | 0.6 | 0.8; P = 1.8 | 2.5; m = 30 | 40

## A line of X = {X} pu between 1 pu buses must carry {P} pu at an angle of no more than {m}°.

::: part
answer: (1 - sin(m*pi/180)/(P*X))*100
unit: %
tolerance: 0.5%

### What series compensation does that require?

::: misses
- [any] Need $X(1 - k) \le \sin\delta_\max/P$.
:::
:::
:::

::: check
kind: parts
given: S = 5000 | 10000; L = 2000 | 3000; V = 13.8 | 34.5

## A {V} kV substation transformer fed from a {S} MVA source must keep the fault level on its secondary below {L} MVA.

::: part
answer: 100/L - 100/S
tolerance: 0.5%

### What is the least transformer reactance, in per unit on 100 MVA?

::: misses
- [100/L] The source's impedance helps too.
- [any] Total $\ge S_\text{base}/S_\text{limit}$, minus the source's $S_\text{base}/S_{sc}$.
:::
:::
:::

::: check
kind: parts
given: S = 800 | 2000 | 4000; V = 13.8 | 69 | 138; r = 1.05 | 1.15

## A breaker at a {V} kV bus with a {S} MVA fault level must interrupt with an asymmetry factor of {r}.

::: part
answer: S*1e6/(sqrt(3)*V*1e3)/1e3
unit: kA
tolerance: 0.5%

### What symmetrical fault current must it handle?

::: misses
- [any] $S/(\sqrt3V)$.
:::
:::

::: part
answer: r*S*1e6/(sqrt(3)*V*1e3)/1e3
unit: kA
tolerance: 0.5%

### And its asymmetrical interrupting current?

::: misses
- [any] Times the asymmetry factor.
:::
:::
:::

::: check
kind: parts
given: I = 300 | 450 | 800; k = 1.5 | 2; n = 5 | 1

## A feeder carries at most {I} A of load. Its overcurrent relay picks up at {k} times that, through a CT with {n} A secondary rating, chosen as the smallest standard ratio of 100, 200, 400, 600, 800, 1200 or 1600 to {n} that covers the maximum load.

::: part
answer: k*I
unit: A
tolerance: 0.5%

### What primary pickup current is set?

::: misses
- [any] {k} × the maximum load.
:::
:::

::: part
answer: k*I/((400*step(400 - I) + 600*step(I - 400)*step(600 - I) + 800*step(I - 600))/n)
unit: A
tolerance: 0.5%

### What secondary pickup current does the relay see?

::: misses
- [any] Primary pickup over the CT ratio.
:::
:::
:::

::: check
kind: parts
given: Z = 20 | 45 | 80; C = 120 | 240; V = 1000 | 2000

## A line has {Z} Ω of positive-sequence impedance; CT ratio {C}, VT ratio {V}. Zone 1 covers 80% and zone 2 120% of the line.

::: part
answer: 0.8*Z*C/V
unit: Ω
tolerance: 0.5%

### What zone 1 reach, in secondary ohms?

::: misses
- [0.8*Z*V/C] Secondary ohms multiply by CTR/VTR.
- [any] $0.8Z \times \text{CTR}/\text{VTR}$.
:::
:::

::: part
answer: 1.2*Z*C/V
unit: Ω
tolerance: 0.5%

### And zone 2?

::: misses
- [any] $1.2Z \times \text{CTR}/\text{VTR}$.
:::
:::
:::

::: check
kind: parts
given: S = 100 | 250 | 500; Q = 5 | 10 | 20; h = 4.7 | 4.3

## A {Q} Mvar capacitor bank at a bus with a {S} MVA fault level is to be detuned to the {h}th harmonic.

::: part
answer: sqrt(S/Q)
tolerance: 0.5%

### Where would it resonate without detuning?

::: misses
- [any] $\sqrt{S_{sc}/Q}$.
:::
:::

::: part
answer: 100/h^2
unit: %
tolerance: 0.5%

### What series reactor, as a percentage of the capacitor's reactance, tunes it to {h}?

::: misses
- [100/h] Resonance needs $X_L = X_C/h^2$.
- [any] $X_L/X_C = 1/h^2$.
:::
:::
:::

::: check
kind: parts
given: d = 4 | 7 | 9; r = 0.625 | 1.25

## A feeder's far end runs {d}% low at peak. A regulator at the substation steps {r}% per tap.

::: part
answer: ceil((d - 1)/r - 1e-9)
unit: steps
tolerance: 0

### How many steps up bring the far end within 1% of nominal?

::: misses
- [any] Raise the end from −{d}% to at least −1%, rounding up.
:::
:::
:::

::: check
kind: parts
given: S = 10 | 20; H = 2 | 4; P = 1 | 2; r = 0.3 | 0.5

## A {S} GW system with H = {H} s must keep ROCOF below {r} Hz/s after losing {P} GW.

::: part
answer: P/(2*H*S)*60
unit: Hz/s
tolerance: 0.5%

### What ROCOF does the loss cause without help?

::: misses
- [any] $\Delta Pf_0/(2HS)$.
:::
:::

::: part
answer: 1e3*(P - 2*H*S*r/60)*step(P - 2*H*S*r/60)
unit: MW
tolerance: 0.5%

### How much fast frequency response must act at once to meet the limit (zero if none)?

::: misses
- [any] The net loss must fall to $2HS\cdot\text{ROCOF}/f_0$.
:::
:::
:::

::: check
kind: parts
given: X = 0.2 | 0.4; f = 0.9 | 0.95; m = 15 | 30

## A radial line of X = {X} pu from a 1 pu source supplies load at power factor {f} lagging, with a required loadability margin of {m}%.

::: part
answer: f/(2*X*(1 + sqrt(1 - f^2)))/(1 + m/100)
tolerance: 0.5%

### What is the most load it may carry?

::: misses
- [any] $P_\max/(1 + \text{margin})$.
:::
:::
:::

::: check
kind: parts
given: E = 400 | 600; H = 200 | 350; m = 300 | 500; p = 30 | 60

## A unit loses {H} dollars per hour running at {m} MW through a night of off-peak prices; restarting costs {E} dollars per start plus {p} dollars per MW of minimum output to warm up.

::: part
answer: (E + p*m)/H
unit: h
tolerance: 0.5%

### Above how many off-peak hours is shutting down cheaper?

::: misses
- [any] Total restart cost over the hourly loss.
:::
:::
:::

::: check
kind: parts
given: l = 200 | 350; V = 345 | 500; b = 4 | 5

## A {V} kV line of {l} km (b = {b} µS/km) gets shunt reactors at both ends that together absorb 75% of its charging, split equally.

::: part
answer: 0.75*V^2*b*l*1e-6/2
unit: Mvar
tolerance: 0.5%

### What rating does each end's reactor need?

::: misses
- [any] Half of 75% of $V^2B$.
:::
:::
:::

::: check
kind: choice

## A designer can meet a transfer limit on a long line either with 50% series compensation or with a midpoint STATCOM. Which concern applies to the series capacitors but not the STATCOM?

- [ ] Reactive power loss
- [x] Subsynchronous resonance: a series-compensated line has an electrical resonance below 60 Hz that can interact with nearby turbine-generator shaft modes, so studies and sometimes damping controls are needed
- [ ] Harmonic currents only
- [ ] It can't raise the transfer limit

::: misses
- [1] Both handle vars; that's not the distinct risk.
- [3] Converters are the more common harmonic source.
- [4] Both raise it.
:::
:::
:::