title: "Problem set 12: operating the grid"
heading: "Problem set 12: area control error, interconnection frequency response, inertia and ROCOF, state estimation, contingency flows, transfer distribution, dynamic ratings, phase shifters, marginal prices, reliability indices, solar on feeders, harmonics and HVDC converters"
eyebrow: S10 · Problem set 12
type: problems
---

::: hook
These problems follow a system operator's day: frequency and interchange, the estimator's picture of the network, the security checks that keep it safe after any single outage, the market that prices every bus, and the distribution feeders, harmonics and converters at its edges.
:::

::: pool
pick: 12

::: check
kind: parts
given: T = -80 | 50 | 120; f = -0.04 | 0.02 | 0.05; B = -50 | -150 | -400

## An area's tie-line flow is {T} MW from schedule, frequency is {f} Hz from 60, and its bias is {B} MW/0.1 Hz.

::: part
answer: T - 10*B*f
unit: MW
tolerance: 0.5%

### What is its area control error?

::: misses
- [T - B*f] The bias is per 0.1 Hz: multiply by 10.
- [any] $(P_\text{tie} - P_\text{sched}) - 10B(f - f_0)$.
:::
:::
:::

::: check
kind: parts
given: S = 50 | 200; R = 0.04 | 0.05; D = 1 | 1.5; P = 1 | 2.5

## An interconnection of {S} GW (all generation at droop {R}, load damping D = {D}) loses {P} GW.

::: part
answer: -P/S/(1/R + D)*60
unit: Hz
tolerance: 0.5%

### Where does its frequency settle, relative to 60 Hz?

::: misses
- [any] $\Delta f = -\Delta P/(1/R + D)$ in per unit.
:::
:::

::: part
answer: P*1e3/(-P/S/(1/R + D)*60/0.1)
unit: MW
tolerance: 0.5%

### What is its frequency response, in MW per 0.1 Hz (negative)?

::: misses
- [any] Loss over the deviation in tenths of a hertz.
:::
:::
:::

::: check
kind: parts
given: S = 40 | 80; H = 4 | 6; s = 0.3 | 0.6; P = 1.5 | 3

## A {S} GW system's synchronous units have H = {H} s, and {s} of its generation is inverter-based without inertia. It loses {P} GW.

::: part
answer: P/(2*(1 - s)*H*S)*60
unit: Hz/s
tolerance: 0.5%

### What is the initial ROCOF?

::: misses
- [P/(2*H*S)*60] The inverter-based share contributes no inertia.
- [any] $\Delta Pf_0/(2(1 - s)HS)$.
:::
:::
:::

::: check
kind: parts
given: a = 0.95 | 1.05; s = 0.01 | 0.03; b = 1.0 | 1.12; t = 0.02 | 0.05

## Two meters on one flow read {a} pu (σ = {s}) and {b} pu (σ = {t}).

::: part
answer: (a/s^2 + b/t^2)/(1/s^2 + 1/t^2)
tolerance: 0.5%

### What is the WLS estimate?

::: misses
- [any] Inverse-variance weighting.
:::
:::

::: part
answer: abs(a - b)/sqrt(s^2 + t^2)
tolerance: 0.5%

### What is the normalized difference between the readings (above 3 suggests bad data)?

::: misses
- [any] |a − b| over $\sqrt{\sigma_a^2 + \sigma_b^2}$.
:::
:::
:::

::: check
kind: parts
given: f = 0.4 | 0.7; g = 0.6 | -0.5 | 0.9; p = 0.2 | 0.35; k = 0.3 | 0.6

## A monitored line carries {f} pu; line k carries {g} pu. For a transfer between line k's ends, line k itself takes {k} and the monitored line {p}.

::: part
answer: p/(1 - k)
tolerance: 0.5%

### What is the outage distribution factor?

::: misses
- [p] Divide by 1 − PTDF_k.
- [any] $p/(1 - k)$.
:::
:::

::: part
answer: f + p/(1 - k)*g
tolerance: 0.5%

### What does the monitored line carry if line k trips?

::: misses
- [any] $f + dg$.
:::
:::
:::

::: check
kind: parts
given: a = 0.1 | 0.25 | 0.4; T = 100 | 300; f = 250 | 500; R = 400 | 600

## A line's PTDF for a {T} MW transaction is {a}; it already carries {f} MW against a {R} MW rating.

::: part
answer: f + a*T
unit: MW
tolerance: 0.5%

### What will it carry with the transaction?

::: misses
- [any] Existing flow plus PTDF × transaction.
:::
:::

::: part
answer: (R - f)/a
unit: MW
tolerance: 0.5%

### What's the largest such transaction its rating allows?

::: misses
- [any] Headroom over the PTDF.
:::
:::
:::

::: check
kind: parts
given: c = 45 | 70; r = 15 | 25; s = 10 | 14; k = 1.4 | 1.8 | 2.5; I = 800 | 1200

## A line rated {I} A at static conditions sheds {c} W/m by convection, {r} W/m by radiation and absorbs {s} W/m of sun. Measured wind raises convection {k} times.

::: part
answer: I*sqrt((k*c + r - s)/(c + r - s))
unit: A
tolerance: 0.5%

### What is its dynamic rating?

::: misses
- [any] Scale by the square root of the cooling ratio.
:::
:::
:::

::: check
kind: parts
given: x = 0.05 | 0.1; y = 0.15 | 0.3; P = 1 | 2; R = 0.6 | 1

## A {P} pu transfer splits between path A (x = {x} pu, rated {R} pu) and path B (x = {y} pu). A phase shifter on A may be used.

::: part
answer: P*y/(x + y)
tolerance: 0.5%

### What does A carry naturally?

::: misses
- [any] Inverse to reactance.
:::
:::

::: part
answer: (R*(x + y) - P*y)*180/pi*step(P*y/(x + y) - R)
unit: °
tolerance: 1%

### What phase shift (negative relieves A) brings A to its rating, if it's over?

::: misses
- [any] Shifting by φ moves φ/(x + y) pu from A to B: φ = (R − natural flow)(x + y), in degrees, zero if not over.
:::
:::
:::

::: check
kind: parts
given: l = 20 | 35; B = 0.0001 | 0.0002; P = 200 | 400; c = 0 | 15

## A remote generator priced {l} dollars per MWh sends {P} MW with losses $BP^2$ (B = {B} per MW) to a bus where congestion adds {c} dollars per MWh.

::: part
answer: l/(1 - 2*B*P) + c
tolerance: 0.5%

### What is the receiving bus's LMP?

::: misses
- [any] Energy with marginal losses, plus congestion.
:::
:::
:::

::: check
kind: parts
given: N = 20000 | 80000; m = 15000 | 50000; k = 60 | 120

## A utility serving {N} customers had {m} customer interruptions in a year, averaging {k} minutes each.

::: part
answer: m/N
tolerance: 0.5%

### What is its SAIFI?

::: misses
- [any] Interruptions per customer.
:::
:::

::: part
answer: m*k/N
unit: min
tolerance: 0.5%

### What is its SAIDI?

::: misses
- [m/N] That's SAIFI.
- [any] Customer-minutes per customer.
:::
:::
:::

::: check
kind: parts
given: R = 1 | 2.5; X = 2 | 4; P = 2 | 4; Q = 0.5 | 1.5; V = 12.47 | 24.9

## Inverters export {P} MW and absorb {Q} Mvar at the end of a {V} kV feeder of {R} + j{X} Ω.

::: part
answer: (R*P - X*Q)/V^2*100
unit: %
tolerance: 1%

### How much do they change the voltage there?

::: misses
- [any] $(RP - XQ)/V^2$.
:::
:::

::: part
answer: R*P/X
unit: Mvar
tolerance: 0.5%

### How many vars would cancel the rise completely?

::: misses
- [any] Set RP = XQ.
:::
:::
:::

::: check
kind: parts
given: I = 50 | 120; a = 10 | 30; b = 5 | 15

## Each phase of a balanced four-wire load draws {I} A of fundamental, {a} A of third harmonic and {b} A of fifth.

::: part
answer: sqrt(a^2 + b^2)/I*100
unit: %
tolerance: 0.5%

### What is each phase's current THD?

::: misses
- [any] $\sqrt{I_3^2 + I_5^2}/I_1$.
:::
:::

::: part
answer: 3*a
unit: A
tolerance: 0.5%

### What flows in the neutral?

::: misses
- [a] Third harmonics add in the neutral: three times.
- [any] Fundamentals and fifths cancel; thirds add.
:::
:::
:::

::: check
kind: parts
given: V = 150 | 200 | 400; a = 10 | 15 | 20; X = 8 | 15; I = 1 | 2 | 3

## A rectifier's valve-side line voltage is {V} kV RMS; it fires at α = {a}° and carries {I} kA through a commutating reactance of {X} Ω.

::: part
answer: 3*sqrt(2)/pi*V*cos(a*pi/180) - 3/pi*X*I
unit: kV
tolerance: 0.5%

### What is its DC voltage?

::: misses
- [any] $1.35V_{LL}\cos\alpha - (3/\pi)X_cI_d$.
:::
:::

::: part
answer: (3*sqrt(2)/pi*V*cos(a*pi/180) - 3/pi*X*I)*I
unit: MW
tolerance: 0.5%

### What power does it deliver?

::: misses
- [any] $V_dI_d$.
:::
:::
:::

::: check
kind: choice

## Why does a system operator run contingency analysis continuously rather than only when a line trips?

- [ ] Lines trip on a schedule
- [x] Security means being ready for the next outage before it happens: the operator must keep the present state such that any single loss leaves every flow and voltage within emergency limits, which has to be checked against the changing flows all day
- [ ] It's needed only for billing
- [ ] It replaces the state estimator

::: misses
- [1] Outages are random.
- [3] It's about reliability.
- [4] It runs on the estimator's output.
:::
:::
:::