title: "Problem set 6: capability, adequacy and dispatch"
heading: "Problem set 6: generator capability limits and their dependence on voltage, underexcitation limits, voltage regulators and reactive sharing, outage probabilities and loss-of-load expectation, reserve margins, lambda dispatch with limits and losses, and congested markets"
eyebrow: S10 · Problem set 6
type: problems
---

::: hook
These problems cover lessons 26, 33 and 34: what a generator can deliver and absorb, how voltage regulators share the vars, whether a fleet of imperfect units can be trusted to cover the peak, and the dispatch and pricing calculations of the dispatch lab.
:::

::: pool
pick: 12

::: check
kind: parts
given: X = 1 | 1.4 | 1.8; E = 2 | 2.4; P = 0.6 | 0.9; V = 0.95 | 1 | 1.05

## A generator rated 1 pu ($X_s$ = {X} pu, field limit E = {E} pu) runs at {P} pu and {V} pu terminal voltage.

::: part
answer: (sqrt(V^2 - P^2) + (-V^2/X + sqrt((E*V/X)^2 - P^2)) - abs(sqrt(V^2 - P^2) - (-V^2/X + sqrt((E*V/X)^2 - P^2))))/2
tolerance: 0.5%

### How many vars can it supply?

::: misses
- [any] The smaller of the armature and field limits.
:::
:::
:::

::: check
kind: parts
given: X = 1.2 | 1.6 | 2; e = 0.15 | 0.3 | 0.5; P = 0.4 | 0.8

## A machine ($X_s$ = {X} pu) reaches a stiff 1 pu bus through $X_e$ = {e} pu and delivers {P} pu.

::: part
answer: -(0.5*(1/e - 1/X) - sqrt((0.5*(1/e + 1/X))^2 - P^2))
tolerance: 0.5%

### How many vars can it absorb before the steady-state stability limit?

::: misses
- [any] The lower arc of the circle about $\frac12(1/X_e - 1/X_s)$ with radius $\frac12(1/X_e + 1/X_s)$.
:::
:::
:::

::: check
kind: parts
given: S = 250 | 600; f = 0.85 | 0.9; V = 0.92 | 0.96

## A {S} MVA generator, rated at power factor {f}, delivers its rated real power while the terminal voltage sags to {V} pu; its armature limit binds.

::: part
answer: S*sqrt(V^2 - f^2)
unit: Mvar
tolerance: 0.5%

### How many vars can it still supply?

::: misses
- [S*sqrt(1 - f^2)] That's at rated voltage.
- [any] $S\sqrt{V^2 - \cos^2\phi}$ in per unit of S.
:::
:::

::: part
answer: (1 - sqrt(V^2 - f^2)/sqrt(1 - f^2))*100
unit: %
tolerance: 0.5%

### By what percentage has its reactive capability fallen?

::: misses
- [any] Compare with $S\sin\phi$.
:::
:::
:::

::: check
kind: parts
given: a = 2 | 4; b = 5 | 7; c = 3 | 6; Q = 60 | 150

## Three equal generators with reactive droops of {a}%, {b}% and {c}% share a {Q} Mvar rise in demand.

::: part
answer: Q*(1/a)/(1/a + 1/b + 1/c)
unit: Mvar
tolerance: 0.5%

### How much does the first one take?

::: misses
- [any] Shares go as 1/droop.
:::
:::
:::

::: check
kind: parts
given: K = 25 | 100 | 300; d = 0.02 | 0.05

## A proportional AVR with gain {K} holds a generator's terminal voltage; a load change would shift the uncontrolled voltage by {d} pu.

::: part
answer: d/(1 + K)
tolerance: 0.5%

### How much does the regulated voltage shift?

::: misses
- [any] Divided by $1 + K_A$.
:::
:::
:::

::: check
kind: parts
given: n = 4 | 6 | 8; q = 0.03 | 0.06 | 0.1

## {n} identical units, each with forced outage rate {q}.

::: part
answer: 1 - (1 - q)^n - n*q*(1 - q)^(n - 1) - n*(n - 1)/2*q^2*(1 - q)^(n - 2)
tolerance: 1%

### What is the probability that three or more are out at once?

::: misses
- [any] One minus the probabilities of 0, 1 and 2 out.
:::
:::
:::

::: check
kind: parts
given: q = 0.04 | 0.08; L = 420 | 480; d = 30 | 80; M = 330 | 360

## Six 100 MW units (FOR {q}) see {d} days a year with a {L} MW peak and the rest at {M} MW.

::: part
answer: d*(1 - (1 - q)^6 - 6*q*(1 - q)^5)
unit: days
tolerance: 1%

### What LOLE do the high days contribute?

::: misses
- [any] Two or more units out leaves 400 MW, below the peak.
:::
:::

::: part
answer: (365 - d)*(1 - (1 - q)^6 - 6*q*(1 - q)^5 - 15*q^2*(1 - q)^4)
unit: days
tolerance: 1%

### And the other days?

::: misses
- [any] Three or more out leaves 300 MW, below {M}.
:::
:::
:::

::: check
kind: parts
given: a = 150 | 300; q = 0.05 | 0.1; b = 100 | 250; r = 0.03 | 0.08; L = 260 | 320

## A system of a {a} MW unit (FOR {q}) and a {b} MW unit (FOR {r}) serves {L} MW.

::: part
answer: q*r + q*(1 - r)*step(L - b) + r*(1 - q)*step(L - a)
tolerance: 1%

### What is its loss-of-load probability?

::: misses
- [q*r] A single outage leaves the other unit, which may not cover the load alone.
- [any] Add every outage state whose remaining capacity is below the load.
:::
:::
:::

::: check
kind: parts
given: C = 1000 | 2500; P = 820 | 2100; N = 150 | 400; k = 10 | 25

## A system with {C} MW installed and a {P} MW peak adds a {N} MW wind farm whose capacity credit is {k}%.

::: part
answer: (C - P)/P*100
unit: %
tolerance: 0.5%

### What was its reserve margin?

::: misses
- [any] (C − P)/P.
:::
:::

::: part
answer: (C + N*k/100 - P)/P*100
unit: %
tolerance: 0.5%

### What is it counting the wind at its capacity credit?

::: misses
- [(C + N - P)/P*100] Count only the credited capacity.
- [any] Add N × credit.
:::
:::
:::

::: check
kind: parts
given: b = 8 | 9; c = 0.004 | 0.006; d = 7 | 10; e = 0.005 | 0.008; D = 700 | 1100; M = 300 | 400

## Two units with incremental costs {b} + 2({c})P and {d} + 2({e})P share {D} MW; the first is limited to {M} MW.

::: part
answer: ((D + b/(2*c) + d/(2*e))/(1/(2*c) + 1/(2*e)) - b)/(2*c)*step(M - ((D + b/(2*c) + d/(2*e))/(1/(2*c) + 1/(2*e)) - b)/(2*c)) + M*step(((D + b/(2*c) + d/(2*e))/(1/(2*c) + 1/(2*e)) - b)/(2*c) - M)
unit: MW
tolerance: 0.5%

### What does the first unit produce?

::: misses
- [any] Find λ from both units; if the first exceeds its limit, pin it there.
:::
:::
:::

::: check
kind: parts
given: l = 15 | 25; B = 0.0001 | 0.0003; P = 150 | 300

## A remote plant sends {P} MW with losses $BP^2$, B = {B} per MW; the system λ is {l} dollars per MWh.

::: part
answer: 1/(1 - 2*B*P)
tolerance: 0.5%

### What is its penalty factor?

::: misses
- [any] $1/(1 - 2BP)$.
:::
:::

::: part
answer: l*(1 - 2*B*P)
tolerance: 0.5%

### What incremental cost should it run at?

::: misses
- [l/(1 - 2*B*P)] Its penalized cost must equal λ: its own cost is λ divided by L.
- [any] λ/L.
:::
:::
:::

::: check
kind: parts
given: a = 18 | 25; b = 40 | 60; D = 300 | 500; L = 200 | 350

## A {a} dollars per MWh unit at A and a {b} dollars per MWh unit at B serve {D} MW at B through a {L} MW line.

::: part
answer: b*step(D - L) + a*step(L - D)
tolerance: 0.5%

### What is the price at B?

::: misses
- [any] If the line binds, B's own unit sets it.
:::
:::

::: part
answer: L*(b - a)*step(D - L)
tolerance: 0.5%

### What congestion rent accrues per hour?

::: misses
- [any] Flow times price difference, if congested.
:::
:::
:::

::: check
kind: parts
given: H = 300 | 500; S = 5000 | 12000; c = 2 | 3

## A unit costs {S} dollars to start and loses {H} dollars per hour running at its minimum through off-peak hours.

::: part
answer: S/H
unit: h
tolerance: 0.5%

### For how many off-peak hours is it cheaper to keep it running than to shut it down and restart?

::: misses
- [any] Start-up cost over the hourly loss.
:::
:::
:::

::: check
kind: choice

## A planner adds a 400 MW unit with a 10% forced outage rate to a system of eight 100 MW units with 5% outage rates. Why might that improve the loss-of-load expectation less than four more 100 MW units would?

- [ ] Large units cost more
- [x] A single large unit's outage removes all 400 MW at once, and with its higher outage rate that happens often, while four small units rarely fail together; the same megawatts split among small, reliable units cover the peak with far higher probability
- [ ] The LOLE ignores unit sizes
- [ ] Small units have lower capacity credit

::: misses
- [1] Cost isn't what LOLE measures.
- [3] LOLE depends directly on sizes through the outage table.
- [4] Their credit is higher, if anything.
:::
:::
:::