title: Transformers in power systems
heading: The equivalent circuit from open- and short-circuit tests, voltage regulation and efficiency, three-phase connections and the 30° phase shift of Y–Δ banks, autotransformers, and tap changers
eyebrow: S10 · Lesson 3 · Transformers in power systems
xp: 50
---

::: hook
Between a power plant and a wall socket a kilowatt-hour typically passes through four or five transformers, each almost perfect: efficiencies above 99% are routine for large units. Their imperfections still matter. The leakage reactance sets how far the voltage sags under load and how large the fault currents are, the Y–Δ connection shifts the phase by 30° and blocks zero-sequence current, and taps let operators nudge voltages up and down by a few percent. This lesson builds the model power-system studies use.
:::

::: play
- The phasor diagram of a loaded transformer in per unit: the secondary voltage (1 pu), the drop across the series impedance R + jX, and the primary voltage needed to supply it.
- At lagging power factor the drop adds almost in phase with the voltage, so the primary must be higher: positive regulation.
- Swing the load to leading power factor and the reactive drop turns to point backward: the secondary can end up *above* the primary.
:::

```sim plot
view: complex
range: 1.4
axes: Re, Im
slider: R = 0..0.1 = 0.02
slider: X = 0..0.3 = 0.1
slider: th = -60..60 = 37 °
slider: L = 0..1.5 = 1
arrow: 1 | label: V₂
arrow: (R + j*X)*L*exp(-j*th*pi/180) | from: 1 | label: IZ
arrow: 1 + (R + j*X)*L*exp(-j*th*pi/180) | color: ch3 | label: V₁
readout: regulation, % = 100*(abs(1 + (R + j*X)*L*exp(-j*th*pi/180)) - 1) | digits: 3
```

::: predict
## A transformer has R = 0.012 pu and X = 0.060 pu. At full load and 0.8 power factor lagging, by how much does its secondary voltage drop from no load to full load?

- [ ] About 1%
- [x] About 4.6%
- [ ] About 6%
- [ ] About 7.2%

::: reveal
The drop is $IZ$ with I = 1∠−36.9°: $(0.012 + j0.060)(0.8 - j0.6) = 0.0456 + j0.0408$, so the primary needs $|1.0456 + j0.0408|$ = 1.0463 pu: 4.6% regulation. The quick estimate $R\cos\phi + X\sin\phi$ = 4.56% is close because the drop is nearly in phase with V.
:::
:::

::: nameit
## Equivalent circuit

An ideal transformer plus a series impedance $R_{eq} + jX_{eq}$ (winding resistance and leakage reactance) and a shunt branch (core loss and magnetizing reactance). In per unit the series impedance is the same from either side.

- **Short-circuit test:** short one winding and raise the voltage on the other until rated current flows. $Z_{eq} = V_{sc}/I_{sc}$, $R_{eq} = P_{sc}/I_{sc}^2$, $X_{eq} = \sqrt{Z_{eq}^2 - R_{eq}^2}$.
- **Open-circuit test:** rated voltage on one side, the other open: the input power is the core loss and the current is the magnetizing current.

## Regulation and efficiency

**Regulation** is $(|V_\text{no load}| - |V_\text{full load}|)/|V_\text{full load}|$, approximately $R\cos\phi + X\sin\phi$ in per unit at full load (with φ positive for lagging). **Efficiency** is output over output plus copper loss ($I^2R$, varies with load) plus core loss (roughly constant).

## Three-phase connections

Three single-phase units or one three-phase core, connected Y or Δ on each side. In a Y–Δ bank the line-to-line voltages on the two sides differ in phase by 30°; under the US standard the high-voltage side leads by 30° for positive sequence. A Δ winding also traps zero-sequence currents (lesson 37). A Y-connected winding's unit sees $V_L/\sqrt{3}$.

## Autotransformers

A single tapped winding with part of the power passed by conduction. Rewiring a two-winding transformer as an autotransformer between $V_L$ and $V_H$ raises its rating to $S\frac{V_H}{V_H - V_L}$, and its per-unit series impedance falls by the factor $1 - V_L/V_H$, which raises fault currents.

## Taps

Off-load taps set a fixed ratio a few percent from nominal; on-load tap changers and regulators move in steps (often ±10% in 32 steps) to hold voltage as load changes.
:::

::: example
## A 20 kVA, 8000/240 V transformer's short-circuit test on the 8 kV side reads 489 V, 2.5 A and 240 W. Find its per-unit impedance and full-load regulation at 0.8 lagging.

::: solution
1. **Series impedance from the test.**
   $$\begin{aligned} Z_{eq} &= 489/2.5 \\ &= 195.6\ \Omega \\ R_{eq} &= 240/2.5^2 \\ &= 38.4\ \Omega \end{aligned}$$
   so $X_{eq}$ = 191.8 Ω.
2. **Per unit.** The 8 kV base is
   $$\begin{aligned} Z_\text{base} &= 8000^2/20\,000 \\ &= 3200\ \Omega \end{aligned}$$
   so Z = 0.012 + j0.0599 pu.
3. **Regulation at 0.8 lagging.**
   $$\begin{aligned} \text{VR} &= |1 + (0.012 + j0.0599) \\ &\quad \times (0.8 - j0.6)| - 1 \\ &= 4.64\% \end{aligned}$$
4. **At 0.8 leading.** The same calculation gives −2.48%: the secondary rises above no-load.

**Answer:** Z = 0.012 + j0.0599 pu, and the full-load regulation at 0.8 lagging is 4.64%.
:::
:::

::: example
## A 100 kVA, 13.2/1.2 kV transformer is reconnected as a 13.2/14.4 kV autotransformer. What can it carry?

::: solution
1. **What the windings carry.** The windings still carry their rated currents, but now only the 1.2 kV series winding's share is transformed.
2. **Autotransformer rating.**
   $$\begin{aligned} S_\text{auto} &= 100 \times \frac{14.4}{14.4 - 13.2} \\ &= 1200\ \text{kVA} \end{aligned}$$
   twelve times the two-winding rating.
3. **Where it's used.** That's why autotransformers are used to tie systems of similar voltage, such as 345 and 230 kV.

**Answer:** 1200 kVA, twelve times its rating as a two-winding transformer.
:::
:::

::: example
## A 100 kVA transformer has 500 W of core loss and 1500 W of copper loss at full load. At what load is it most efficient, and how efficient is it there and at full load (unity power factor)?

::: solution
1. **Load for peak efficiency.** Efficiency peaks where the copper loss, which grows as the square of the load fraction x, equals the fixed core loss:
   $$1500x^2 = 500 \quad\text{so}\quad x = 0.577$$
2. **Efficiency there.** In kW:
   $$\begin{aligned} \eta &= \frac{57.7}{57.7 + 0.5 + 0.5} \\ &= 98.30\% \end{aligned}$$
3. **Efficiency at full load.**
   $$\begin{aligned} \eta &= \frac{100}{100 + 0.5 + 1.5} \\ &= 98.04\% \end{aligned}$$
4. **Why it matters.** Distribution transformers, lightly loaded most of the day, are designed with low core loss for exactly this reason.

**Answer:** it's most efficient at 57.7% of full load, where it reaches 98.30%, and 98.04% efficient at full load.
:::
:::

::: check
given: V = 300 | 489 | 900; I = 2.5 | 10; P = 100 | 300
answer: sqrt((V/I)^2 - (P/I^2)^2)
unit: Ω
tolerance: 0.5%

## A short-circuit test reads {V} V, {I} A and {P} W. What's the leakage reactance?

::: right
Right. $\sqrt{(V/I)^2 - (P/I^2)^2}$ = {answer} Ω.
:::

::: misses
- [any] Not yet. $Z = V/I$, $R = P/I^2$, $X = \sqrt{Z^2 - R^2}$.
:::
:::

::: check
given: r = 0.005 | 0.012; x = 0.04 | 0.08 | 0.12; f = 0.8 | 0.9
answer: 100*(sqrt((1 + r*f + x*sqrt(1 - f^2))^2 + (x*f - r*sqrt(1 - f^2))^2) - 1)
unit: %
tolerance: 0.5%

## A transformer with R = {r} pu and X = {x} pu runs at full load, power factor {f} lagging. What's its exact regulation?

::: right
Right. $|1 + Z\cdot1\angle{-\phi}| - 1$ = {answer}%.
:::

::: misses
- [100*(r*f + x*sqrt(1 - f^2))] That's the approximation; the exact value includes the quadrature part.
- [any] Not yet. Add the drop $IZ$ to 1 pu and take the magnitude.
:::
:::

::: check
given: S = 50 | 100 | 500; L = 115 | 230; d = 23 | 115; let H = L + d
answer: S*H/(H - L)
unit: kVA
tolerance: 0.5%

## A {S} kVA two-winding transformer is reconnected as a {L}/{H} kV autotransformer. What's its new rating?

::: right
Right. $S\frac{V_H}{V_H - V_L}$ = {answer} kVA.
:::

::: misses
- [S*L/(H - L)] Use the high voltage in the numerator: the series winding carries the high-side current.
- [any] Not yet. Only the fraction $1 - V_L/V_H$ is transformed.
:::
:::

::: check
given: V = 138 | 230 | 345 | 500
answer: V/sqrt(3)
unit: kV
tolerance: 0.5%

## A Y-connected bank of single-phase units serves a {V} kV line. What voltage does each unit's winding see?

::: right
Right. $V_L/\sqrt{3}$ = {answer} kV.
:::

::: misses
- [V] That's what a Δ-connected winding sees.
- [any] Not yet. A Y winding sits between line and neutral.
:::
:::

::: check
given: P = 15 | 50; c = 100 | 300; u = 200 | 600; k = 0.5 | 0.75
answer: 100*P*k/(P*k + c/1000 + u/1000*k^2)
unit: %
tolerance: 0.1%

## A transformer rated {P} kW (unity power factor) runs at {k} of full load, with core loss {c} W and full-load copper loss {u} W. What's its efficiency?

::: right
Right. Copper loss scales as load squared: {answer}%.
:::

::: misses
- [100*P*k/(P*k + c/1000 + u/1000)] Copper loss at partial load is $k^2$ times the full-load value.
- [any] Not yet. Output over output plus core plus $k^2$ copper loss.
:::
:::

::: check
given: n = 16 | 32; r = 10 | 15
answer: 2*r/n
unit: %
tolerance: 0.5%

## A regulator covers ±{r}% in {n} equal steps. What's one step?

::: right
Right. The span 2 × {r}% over {n} steps: {answer}%.
:::

::: misses
- [r/n] The range runs from −{r}% to +{r}%.
- [any] Not yet. Total range over the number of steps.
:::
:::

::: check
kind: parts
given: S = 50 | 100 | 500; c = 0.2 | 0.5 | 1; u = 1.5 | 2 | 3

## A {S} kVA transformer has {c}% core loss and {u}% copper loss at full load, both relative to its rating.

::: part
answer: sqrt(c/u)
tolerance: 0.5%

### At what fraction of full load is it most efficient?

::: misses
- [c/u] Copper loss goes as the load squared.
- [any] Where $x^2P_{cu} = P_{core}$.
:::
:::

::: part
answer: 100*sqrt(c/u)/(sqrt(c/u) + 2*c/100)
unit: %
tolerance: 0.1%

### What efficiency does it reach there, at unity power factor?

::: misses
- [any] $x/(x + P_{core} + x^2P_{cu})$ in per unit.
:::
:::

::: part
answer: c*S*10
unit: W
tolerance: 0.5%

### What is the copper loss at that load?

::: misses
- [u*S*10] At peak efficiency the copper loss has fallen to equal the core loss.
- [any] Equal to the core loss.
:::
:::
:::

::: check
kind: derivation
vars: x = 0.05..1.5, c = 0.001..0.02, u = 0.002..0.03

## A transformer carries load x (per unit of rating, unity power factor) with core loss c and full-load copper loss u (per unit).

::: step
answer: u*x^2

### What is the copper loss?
:::

::: step
answer: x/(x + c + u*x^2)

### What is the efficiency?
:::

::: step
answer: sqrt(c/u)

### At what load is the efficiency highest?
:::

::: right
Right. The fixed loss dominates at light load and the copper loss at heavy load; their crossing is the sweet spot.
:::
:::

::: explain
## Why does a transformer's secondary voltage rise above no load when it supplies a leading load?

::: model
The voltage across the transformer's series impedance is the load current times R + jX, and in a power transformer X dominates. For a lagging load the current lags the voltage, so the drop across X, which leads the current by 90°, lines up nearly in phase with the voltage and subtracts from the secondary. For a leading load the current leads, and the jX drop swings around to point nearly opposite the voltage, so it adds to the secondary instead. That's why long cables and capacitor banks at light load can push voltages above nominal, and why operators switch capacitors out at night.
:::
:::

::: practice

::: check
given: V = 120 | 600; I = 4 | 25; P = 80 | 900
answer: P/I^2
unit: Ω
tolerance: 0.5%

## Winding resistance from a test at {V} V, {I} A, {P} W?

::: misses
- [any] $P/I^2$.
:::
:::

::: check
given: r = 0.008 | 0.02; x = 0.05 | 0.1; f = 0.7 | 0.95
answer: 100*(r*f + x*sqrt(1 - f^2))
unit: %
tolerance: 0.5%

## Approximate regulation: R = {r}, X = {x}, pf {f} lagging?

::: misses
- [any] $R\cos\phi + X\sin\phi$.
:::
:::

::: check
given: S = 25 | 200; L = 12 | 220; let H = L*1.15
answer: S*H/(H - L)
unit: kVA
tolerance: 0.5%

## Autotransformer rating: {S} kVA winding, {L}/{H} kV?

::: misses
- [any] $SV_H/(V_H - V_L)$.
:::
:::
:::