S10 · Lesson 22 · Contingency analysis
The N − 1 rule, generation shift and line outage distribution factors from the DC power flow, predicting flows after one or two lines trip, redispatching to relieve an overload, external equivalents, and how control rooms screen thousands of outages
Grid operators don't run the system so that it works. They run it so that it still works after any single line, transformer or generator trips without warning, the N − 1 rule. A large control room checks thousands of possible outages every few minutes, which leaves no time for a full AC power flow on each. How can it predict the flow on every line after an outage from one solved base case?
- A four-bus network (100 MVA base, DC power flow): the slack generator at bus 1; lines 1–2 (x = 0.1), 1–3 (0.2), 2–3 (0.25), 2–4 (0.1) and 3–4 (0.2); loads at bus 3 (slider) and bus 4 (x axis).
- Solid lines are the base-case flows on lines 1–3 and 3–4. Dashed lines are the same flows after line 2–4 trips, predicted from the base case with line outage distribution factors.
- Both lines are rated 1.2 pu. In the base case they're well inside it at the default loads; after the outage, line 3–4 carries all of bus 4's load and line 1–3 picks up 45% of what line 2–4 was carrying. Find the largest bus 4 load that survives the outage.
Predict
Bus 4 is fed by only two lines, 2–4 and 3–4. Line 2–4, carrying 110 MW into bus 4, trips. How much of that 110 MW shifts onto line 3–4?
All of it. Bus 4's load hasn't changed and line 3–4 is now its only connection, so its line outage distribution factor for line 2–4 is exactly 1. The rest of the network rearranges itself to deliver that power to bus 3, which is where the interesting factors (like line 1–3's 0.45) come from.
Name it
The N − 1 rule
A system is secure if no single contingency, the loss of one element, leaves any line above its emergency rating or any voltage outside its limits, and nothing cascades from there. Some pairs of elements that can fail together, such as two circuits on the same towers, are studied as one contingency too.
Shift factors
Because the DC power flow is linear, every flow responds to injections in fixed proportions. The generation shift factor is the change in flow on line ℓ per unit injected at bus i and taken out at the slack. A transfer from bus m to bus n changes line ℓ's flow by the power transfer distribution factor .
Line outage distribution factors
To mimic the loss of line k (from m to n), inject just enough at m and withdraw it at n that the line's own terminals absorb its flow, as if it weren't there. Solving for that injection gives the line outage distribution factor
where are base-case flows and the flows after the outage. If = 1, all of a transfer between line k's ends goes through line k: it's the only connection, and losing it splits the network in two.
Two outages at once use the single-outage factors with a correction for their interaction:
Grainger and Stevenson derive the same factors for the AC network from columns of (lesson 11). With lines represented by their reactances, the AC current-shift factors and the DC factors agree, and the predicted megawatt changes land within a few percent of full AC solutions.
External systems
A utility models its neighbors' networks only as far as it must. Kron-reducing the external buses onto the boundary buses (lesson 11) leaves a Ward equivalent: equivalent branches among the boundary buses plus equivalent injections there, chosen to reproduce the base-case flows on the tie lines.
In the control room
The energy management system screens the full contingency list with the factors, ranks the outages by how badly they would overload lines, and runs AC power flows only on the worst few. If an outage would overload something, operators change the base case before it happens, for example by redispatching generation. Security-constrained dispatch builds these post-outage limits into the dispatch itself.
Worked example
In the four-bus network with 0.5 pu at bus 3 and 1.5 pu at bus 4, line 2–4 trips. Predict the new flows.
Show the solution
- Base case. The base case gives 1–2: 1.229, 1–3: 0.771, 2–3: 0.125, 2–4: 1.104 and 3–4: 0.396 pu.
- A transfer from bus 2 to bus 4. It sends 0.771 of itself through line 2–4, 0.229 through 3–4 and 0.104 through 1–3 (and −0.104 through 1–2, 0.125 through 2–3).
- Outage factors for line 2–4. and = −0.455.
- New flows. and lines 1–2 and 2–3 each carry 0.727 pu.
- Check. A direct solution of the network without line 2–4 gives the same numbers, since the DC model is linear.
- Overloads. Lines 3–4 and 1–3, rated 1.2 pu, would both be overloaded.
Answer 3–4 carries 1.500 pu, 1–3 carries 1.273 pu, and 1–2 and 2–3 carry 0.727 pu each, so lines 3–4 and 1–3 are overloaded.
Worked example
Line 1–3's overload after the outage could be fixed by moving generation from bus 1 to a generator at bus 3 ahead of time. How much?
Show the solution
- The overload. Line 1–3 would carry 1.273 pu, 0.073 over its rating.
- Factors for an injection at bus 3. Injecting at bus 3 (taken from the slack at bus 1) changes line 1–3's base flow by = −0.542 and line 2–4's by −0.208.
- The factor after the outage. With line 2–4 out, it becomes
- Amount to move. so 11.4 MW moved to bus 3 keeps line 1–3 at 1.2 pu after the outage.
- Line 3–4. It can't be helped that way: with bus 4 left on one line, its flow is bus 4's load. That overload needs a stronger line, load relief at bus 4 or a special protection scheme.
Answer move 0.114 pu, 11.4 MW, from bus 1 to bus 3.
Worked example
A monitored line carries 0.5 pu. Line A carries 0.8 pu with distribution factor 0.4 onto it, and line B carries −0.6 pu with factor 0.7. Which single outage is worse for it?
Show the solution
- Losing line A.
- Losing line B.
- Compare. Losing A is worse; losing B actually relieves the line, because B's flow ran against it.
- In practice. Contingency screening runs exactly this arithmetic for every monitored line and every outage, then sends only the worst cases to a full AC power flow.
Answer losing line A is worse: it raises the monitored line to 0.82 pu, while losing B drops it to 0.08 pu.
Check
For a transfer between the ends of line k, line k itself carries 0.4 of it and line ℓ carries 0.2. What's line ℓ's outage distribution factor for line k?
Check
Line ℓ carries 0.6 pu and line k 0.5 pu. Line ℓ's distribution factor for the outage of line k is 0.6. What does line ℓ carry after line k trips (100 MVA base)?
Write units the way you normally would: 1.5 MW, 1500 kW and 0.0015 GW are the same answer.
Check
A line's generation shift factor for bus 5 is 0.35. A generator at bus 5 raises its output by 20 MW, taken up by the slack. How much does the line's flow change?
Write units the way you normally would: 1.5 MW, 1500 kW and 0.0015 GW are the same answer.
Check
A line's generation shift factors are 0.3 for bus m and 0.1 for bus n. What's its PTDF for a transfer from m to n?
Check
After an outage a line would be 0.07 pu over its rating. Moving generation to bus j changes its post-outage flow by −0.4 per unit moved. How much generation must move, in MW (100 MVA base)?
Write units the way you normally would: 1.5 MW, 1500 kW and 0.0015 GW are the same answer.
Check
A network has 120 lines and 10 generators. How many pairs of line outages does a full N − 2 study of lines alone examine?
Check
A monitored line carries 0.3 pu. Line A carries 0.5 pu with distribution factor 0.5 onto it; line B carries 0.7 pu with factor 0.3.
(a)
What does it carry if line A trips?
(b)
And if line B trips?
Check
A monitored line's PTDF for a transfer between the ends of line k is p, and line k's own is k; the lines carry f and g.
Step 1
What is the outage distribution factor?
Type it the way you would write it, like 3sin(2πft) or 3*sin(2*pi*f*t). Angles can be in radians or carry a degree sign, like 45°.
Step 2
What does the monitored line carry after line k trips?
Explain why
Why can one solved base case predict the flows after any line outage, and when does the prediction break down?
In the DC power flow, flows are linear in the injections, so the network's response to any change can be built from unit responses. Removing a line is equivalent to leaving it in and adding a pair of injections at its ends that exactly absorb its flow, so the outage becomes a transfer between its terminals. The size of that transfer depends only on how much of a terminal-to-terminal transfer the line itself would carry, which gives the outage factor . The prediction rests on the DC model's assumptions: flat voltages, small angles and no losses. It degrades when an outage depresses voltages or pushes angles large, and it fails outright when the outage islands part of the system (the denominator goes to zero). That's why screening is followed by AC power flows for the worst cases.
Practice
Keep practicing
10 kinds of problem on this topic, dealt one at a time with new numbers every time, for as long as you like.