S1056 of 56
0 XP
  1. Hook
  2. Problems

S10 · Final exam

Final exam: power system analysis

Twelve problems from the whole course: complex power and per unit, transformers and lines, power transfer and compensation, network matrices and power flow, generators and their capability, generation adequacy, dispatch and prices, frequency control, HVDC, state estimation, faults and open conductors, protection, stability, inverter-based resources and distribution. Give yourself three hours and work without the lessons open. "Another set" deals a different exam.

Check

A 40 MW load at 0.75 lagging on a 138 kV line.

(a)

Line current?

Write units the way you normally would: 1.5 A, 1500 mA and 0.0015 kA are the same answer.

(b)

Capacitor for 0.98?

(c)

Cut in line loss?

Check

A machine (30 MVA, 22 kV, X = 0.08) on a 100 MVA, 24 kV base; a transformer with R = 0.007, X = 0.05 pu at full load, 0.8 lagging.

(a)

Machine's X on the base?

(b)

Transformer regulation?

Check

A 230 kV line, Dm = 7 m, two-conductor bundles 0.5 m apart, GMR 10 mm, radius 17 mm.

(a)

L per km?

Write units the way you normally would: 1.5 mH, 1500 µH and 0.0015 H are the same answer.

(b)

C per km?

(c)

SIL?

Check

An open 150 km, 345 kV line with B = 5 µS/km (wavelength 4940 km).

(a)

Ferranti rise?

(b)

Charging vars?

Write units the way you normally would: 1.5 Mvar, 1500 kvar and 0.0015 Gvar are the same answer.

Check

Buses at 0.97 and 0.95 pu, 25° apart across X = 0.4; the line gets 0.3 series compensation.

(a)

Real power now?

(b)

Transfer limit with compensation?

Check

A two-bus case (X = 0.15, load 0.5 + j0.5); a 300-bus case with 30 PV buses.

(a)

Two-bus load voltage?

(b)

Unknowns in the second?

Check

A triangle (x12 = 0.1, x23 = 0.15, x13 = 0.4) with a generator j0.25 at bus 1.

(a)

PTDF of line 1–3 for a transfer 1 → 3?

(b)

Z33?

Check

A generator with Xs = 1 delivers 0.6 + j0.4 at 1 pu; its field limit is E = 2.3.

(a)

Power angle?

(b)

Most Q at that P?

Check

Two units (4.5, 0.003) and (6.5, 0.008) share 400 MW; separately, a binding triangle with generators at 15 and 40 dollars per MWh.

(a)

λ, dollars per MWh?

(b)

Triangle bus-3 LMP?

Check

A 30 GW system with H = 5 s loses 0.6 GW; a system with droop 0.04 and damping 0.5 loses 0.06 pu.

(a)

ROCOF?

Write units the way you normally would: 1.5 Hz/s, 1500 mHz/s and 0.0015 kHz/s are the same answer.

(b)

Settling deviation in the second?

Check

A 400 MVA generator (X″ = 0.12) and transformer (X = 0.08) on the same base feed a 230 kV bus; X/R = 10 there.

(a)

Three-phase fault current?

Write units the way you normally would: 1.5 kA, 1500 A and 0.0015 MA are the same answer.

(b)

Worst first peak?

Check

A bus with Z1=Z2 = j0.12, Z0 = j0.06.

(a)

Line-to-ground current?

(b)

Neutral reactance for 2.2 pu?

Have paper and a calculator ready. Work each problem out by hand, then enter the answer. Your first try on each one counts toward your score.

Practice

Keep practicing

19 kinds of problem on this topic, dealt one at a time with new numbers every time, for as long as you like.