S10 · Lesson 33 · Generation adequacy and reliability

Will there be enough generation? Forced outage rates, capacity outage probability tables, loss-of-load probability and expectation, the one-day-in-ten-years standard, reserve margins and capacity credit

Every generating unit breaks down now and then: a boiler tube leaks, a transformer fails, a turbine needs repair. These forced outages strike at random, and so do the hot afternoons that drive demand to its peak. Planning enough capacity is therefore a question of probability. How likely is it that the units still running can't cover the load? North American planners have long aimed for a loss of load no more often than one day in ten years. This lesson builds the tables and sums behind that target.

  • The stems are the probabilities of having k of 6 identical units out of service at once, each with a forced outage rate q set by the slider: the binomial distribution (6k)qk(1−q)6−k.
  • With q = 5%, all six are available 73.5% of the time, one is out 23.2% of the time, and three or more are out only 0.22% of the time.
  • Raise q and the distribution shifts right quickly: unreliable units need much larger reserve margins.

Predict

Five 100 MW units, each out 5% of the time at random, serve a 380 MW peak. If that peak lasted every day of the year, about how many days would some load go unserved?

Name it

Forced outages

A unit's forced outage rate (FOR) q is the long-run fraction of time it's unavailable when it should be running, typically 2 to 10%. Units are assumed to fail independently.

The capacity outage probability table

List every possible amount of capacity out of service with its probability. For n identical units of size C,

P(k out)=(nk)qk(1−q)n−k

and for mixed units the table is built one unit at a time: adding a unit of size C and outage rate q turns P(X out) into (1−q)P(X)+qP(X−C).

Loss of load

For a daily peak load L, the loss-of-load probability is the chance that available capacity falls below L: the sum of the table's entries for outages larger than the installed capacity minus L. The loss-of-load expectation adds it up over the year's daily peaks,

LOLE=∑daysP(capacity<Ld)

in days per year. The common planning standard is LOLE ≤ 0.1 day/year, one day in ten years. Related measures are the expected unserved energy and the loss-of-load hours.

Reserves and capacity credit

The reserve margin is (installed capacity − peak)/peak; 15 to 20% has been typical, but the margin that meets the LOLE standard depends on the units' sizes and outage rates. A new resource's capacity credit (effective load carrying capability) is the extra peak load it lets the system serve at the same LOLE. Variable wind and solar earn credits well below their nameplate because their output is often low at the hours of greatest risk.

Worked example

The five 100 MW units (FOR 5%) serve daily peaks of 380 MW on 100 days and 290 MW on the other 265. What is the LOLE?

Show the solution
  1. At 380 MW. Two or more units out cause a loss of load: P=0.0226
  2. At 290 MW. It takes three or more out (leaving 200 MW): P=1−0.7738−0.2036−0.0214=0.00116
  3. LOLE. LOLE=100×0.0226+265×0.00116=2.26+0.31=2.57 days per year.
  4. Compare with the standard. That's still 26 times the standard. The high-load days dominate.

Answer 2.57 days per year.

Worked example

A sixth identical unit is added. What is the LOLE now?

Show the solution
  1. At 380 MW. Three or more of six must be out: P=1−0.956−6(0.05)(0.95)5−15(0.05)2(0.95)4=0.00223
  2. At 290 MW. Four or more must be out: P=8.6×10−5.
  3. LOLE. LOLE=100×0.00223+265×0.000086=0.246 day per year.
  4. Compare. One more unit cut the risk tenfold, though it's still above 0.1: a seventh, or more reliable units, would be needed.

Answer 0.246 day per year.

Worked example

A 100 MW unit with FOR 0.1 is added to a system whose only other unit is 200 MW with FOR 0.05. Build the capacity outage table.

Show the solution
  1. Start from the 200 MW unit. It gives 0 MW out with probability 0.95 and 200 MW out with 0.05.
  2. Add the new unit. P′(X)=0.9P(X)+0.1P(X−100)
  3. The table. This gives:
MW outProbability
00.855
1000.095
2000.045
3000.005
  1. Check. The probabilities sum to 1.
  2. Against a 150 MW load. The system falls short whenever 200 MW or more is out: 0.05.

Answer 0 MW out with probability 0.855, 100 MW 0.095, 200 MW 0.045 and 300 MW 0.005.

Check

A system has 6 identical units, each with forced outage rate 0.02.

(a)

What's the probability all are available?

(b)

That exactly one is out?

(c)

That two or more are out?

Check

Five 100 MW units (FOR 0.05) serve a daily peak of 310 MW on 250 days a year, and much lighter loads otherwise.

(a)

What's the loss-of-load probability on a peak day?

(b)

What LOLE do the peak days contribute per year?

Check

A system has 1200 MW installed for a peak of 1091 MW.

(a)

What is its reserve margin?

Check

A 100 MW unit (FOR 0.05) and a 150 MW unit (FOR 0.08) make up a system.

(a)

What's the probability of no capacity out?

(b)

Of everything out?

(c)

Of exactly one unit out (either)?

Check

A system's LOLE is 2 days per year, and each loss-of-load day averages 4 hours of shortfall.

(a)

By what factor must its risk fall to meet one day in ten years?

(b)

About how many loss-of-load hours per year is that?

Check

A 200 MW wind farm adds the same reliability as 15% of its nameplate in perfectly reliable capacity.

(a)

What is its capacity credit?

Write units the way you normally would: 1.5 MW, 1500 kW and 0.0015 GW are the same answer.

Check

Why can a system meet a 20% reserve margin and still fail the one-day-in-ten-years standard?

Check

A system has n identical units with outage rate q, and a loss of load occurs when two or more are out.

Step 1

What's the probability at most one is out?

Type it the way you would write it, like 3sin(2πft) or 3*sin(2*pi*f*t). Angles can be in radians or carry a degree sign, like 45°.

Check

Write copt(units): a capacity outage probability table as a dict {MW out: probability} from a list of (size, FOR) pairs, built one unit at a time, and lole(units, peaks): the sum over the daily peaks of the probability that available capacity is below each peak.

Python 3.14 with numpy and matplotlib, running in your browser. Tab indents; press Esc and then Tab to move on.

Explain why

Why does adding one more unit cut a system's loss-of-load expectation by much more than its share of capacity would suggest?

Practice

Keep practicing

9 kinds of problem on this topic, dealt one at a time with new numbers every time, for as long as you like.