S10 · Midterm exam
Midterm exam: power system modeling and power flow
Twelve problems from the first half of the course: three-phase and complex power, per unit, transformers, line parameters, ampacity and models, power transfer, voltage stability and compensation, surges, network matrices and their reduction, power flow by Gauss–Seidel, Newton–Raphson and the DC approximation, and contingency analysis. Give yourself two hours and work without the lessons open. "Another set" deals a different exam.
Check
A 60 MW load at 0.9 power factor lagging is served at 138 kV.
(a)
Line current?
Write units the way you normally would: 1.5 A, 1500 mA and 0.0015 kA are the same answer.
(b)
Capacitor to reach 0.98?
Check
A machine (40 MVA, 22 kV, X = 0.1 pu) and a 230 kV line of j40 Ω, on 100 MVA with 24 kV on the machine's side.
(a)
Machine's X?
(b)
Line's X?
(c)
Current on the line for a bolted fault at its far end (1 pu source)?
Write units the way you normally would: 1.5 kA, 1500 A and 0.0015 MA are the same answer.
Check
A short-circuit test reads 400 V, 4 A, 600 W; and a transformer with R = 0.015, X = 0.06 pu at full load, 0.8 lagging.
(a)
Leakage reactance from the test?
Write units the way you normally would: 1.5 Ω, 1500 mΩ and 0.0015 kΩ are the same answer.
(b)
Regulation of the second transformer?
Check
Phases spaced 6, 7, 18 m; two-conductor bundles 0.4 m apart; conductor GMR 13 mm, radius 13 mm.
(a)
L per km?
Write units the way you normally would: 1.5 mH, 1500 µH and 0.0015 H are the same answer.
(b)
C per km?
Check
A 500 kV line with L = 0.9 mH/km and C = 10 nF/km, 500 km long.
(a)
SIL?
Write units the way you normally would: 1.5 MW, 1500 kW and 0.0015 GW are the same answer.
(b)
Open-end voltage rise?
Check
Buses at 0.98 and 0.96 pu, 28° apart, across X = 0.35 pu.
(a)
Real power?
(b)
Reactive power leaving bus 1?
Check
A 1 pu source feeds a unity-pf load of 0.4 pu through X = 0.2 pu.
(a)
Load voltage?
(b)
Maximum deliverable?
Check
A line of X = 0.35 pu with 0.3 series compensation; a 120 Mvar capacitor at 0.92 pu.
(a)
Transfer limit between 1 pu buses?
(b)
Capacitor output?
Write units the way you normally would: 1.5 Mvar, 1500 kvar and 0.0015 Gvar are the same answer.
Check
Generator j\given0.15 at bus 1; bus 3 fed directly by j\given0.1 and via bus 2 by j\given0.15 + j\given0.35; the j\given0.1 line has total charging 0.1 pu.
(a)
?
(b)
Net susceptance the j\given0.1 line adds to bus 3's diagonal?
Check
A 118-bus case with 12 PV buses; and a two-bus case with X = 0.25 and a 1 pu load.
(a)
Unknowns in the first?
(b)
Angle after Newton's first step in the second?
Check
Two-bus: X = 0.15, load 0.5 + j0.4, flat start.
(a)
First Gauss–Seidel iterate's magnitude?
(b)
Converged magnitude?
Check
A triangle with = 0.1, = 0.15, = 0.35 pu carrying 250 MW from bus 1 to bus 3.
(a)
Flow on line 1–3?
Write units the way you normally would: 1.5 MW, 1500 kW and 0.0015 GW are the same answer.
(b)
Angle drop across line 1–2 (100 MVA base)?
Check
A stiff 1 pu source closes, through a resistance of 200 Ω, onto an unloaded lossless line 300 km long with = 300 Ω and wave speed 295 km/ms.
(a)
Size of the first wave launched, in per unit?
(b)
When does it reach the far end?
Write units the way you normally would: 1.5 ms, 1500 µs and 0.0015 s are the same answer.
(c)
Far-end voltage just after it arrives, in per unit?
(d)
Far-end voltage after the second arrival, at three travel times, in per unit?
Check
Line ℓ carries 0.5 pu and line k carries 0.7 pu. Line k carries 0.75 of any transfer between its own ends, and line ℓ carries 0.35 of it. A generator's shift factor on line ℓ is −0.3 with line k in service (100 MVA base).
(a)
Line ℓ's outage distribution factor for line k?
(b)
Line ℓ's flow after line k trips?
Write units the way you normally would: 1.5 MW, 1500 kW and 0.0015 GW are the same answer.
(c)
Line ℓ is rated 80 MW. Ignoring the outage's effect on the shift factor, how much must that generator raise its output beforehand to keep line ℓ within its rating after the outage?
Check
A conductor of 22 mm with 0.07 Ω/km at 75 °C sits in 25 °C air with h = 25 W/m²K, ε = α = 0.5 and 1000 W/m² of sun.
(a)
What is its 75 °C ampacity?
Write units the way you normally would: 1.5 A, 1500 mA and 0.0015 kA are the same answer.
Check
A 1 pu source feeds 0.9 pu at power factor 0.9 lagging through X = 0.2 pu.
(a)
What is the loadability margin?
Have paper and a calculator ready. Work each problem out by hand, then enter the answer. Your first try on each one counts toward your score.
Practice
Keep practicing
16 kinds of problem on this topic, dealt one at a time with new numbers every time, for as long as you like.