S10 · Problem set 10

Problem set 10: problems that combine per unit, lines, power flow, generators, markets, frequency, faults, protection and stability

These problems draw on the whole course, and most chain several ideas: a line's parameters turned into a transfer limit, a per-unit fault current turned into a relay setting, a generator's operating point turned into a stability margin, an inertia loss turned into a frequency nadir requirement. Work them as a review before the final.

Check

A 345 kV line, 150 km: phases spaced 7, 8, 20 m; two-conductor bundles 0.4 m apart, conductor GMR 14 mm.

(a)

Total series reactance?

Write units the way you normally would: 1.5 Ω, 1500 mΩ and 0.0015 kΩ are the same answer.

(b)

Transfer limit between buses held at rated voltage?

Check

A generator (X″ = 0.15) and transformer (X = 0.1, 100 MVA) feed a 230 kV line of j80 Ω, faulted at its far end; the line's relay uses a 100:5 CT and very inverse curve, dial 1, pickup 0.5 × 5 A.

(a)

Fault current on the line?

Write units the way you normally would: 1.5 A, 1500 mA and 0.0015 kA are the same answer.

(b)

Multiple of pickup?

(c)

Relay time?

Check

A slack at 1∠0° serves 0.6 + j0.5 pu through X = 0.15.

(a)

Load voltage?

(b)

Capacitor (pu) to bring the load to 0.95 lagging?

Check

A generator (Xs = 1) delivers 0.7 + j0.5 at 1 pu; in a transient stability study its Pmax is 2.2 pu.

(a)

Internal voltage |E|?

(b)

Critical clearing angle for a zero-transfer fault?

Check

Two units (5, 0.003) and (6.5, 0.008) share 300 MW; unit 1's loss sensitivity is 0.03.

(a)

λ ignoring losses, dollars per MWh?

(b)

Unit 1's effective incremental cost at that dispatch?

Check

A 40 GW system (synchronous H = 3 s, 0.6 inverter-based, droop 0.04, D = 1) loses 3 GW.

(a)

Initial ROCOF?

Write units the way you normally would: 1.5 Hz/s, 1500 mHz/s and 0.0015 kHz/s are the same answer.

(b)

Settling frequency deviation?

Check

A 138 kV bus (100 MVA base) with Z1=Z2 = j0.15, Z0 = j0.1.

(a)

Line-to-ground fault current?

Write units the way you normally would: 1.5 kA, 1500 A and 0.0015 MA are the same answer.

(b)

Line-to-line fault current?

Check

A triangle (x12 = 0.1, x23 = 0.15, x13 = 0.35 pu) carries 250 MW from bus 1 to bus 3; line 1–3 is rated 120 MW.

(a)

Flow on line 1–3?

Write units the way you normally would: 1.5 MW, 1500 kW and 0.0015 GW are the same answer.

(b)

Largest transfer before line 1–3 overloads?

Check

Two machines (H = 3 and 5 s) with E = 1.15 pu each, joined by X = 0.8 pu, 15° apart.

(a)

Synchronizing coefficient?

(b)

Swing frequency?

Write units the way you normally would: 1.5 Hz, 1500 mHz and 0.0015 kHz are the same answer.

Check

A 12.47 kV feeder 4 km long (z = 0.2 + j0.45 Ω/km) with 5 MW of evenly spread unity-pf load; a 1 Mvar capacitor at a 60 MVA bus.

(a)

Voltage drop at the end?

(b)

Capacitor's resonant harmonic?

Check

A line of 30 Ω (CT ratio 200, VT ratio 3000), with L = 1.2 mH/km and C = 10 nF/km over 200 km.

(a)

Zone 1 setting at 80%, secondary ohms?

Write units the way you normally would: 1.5 Ω, 1500 mΩ and 0.0015 kΩ are the same answer.

(b)

Open-end Ferranti rise?

Check

A 118-bus case with 12 PV buses; and a two-bus case with X = 0.2, load 1.2 + j0.2.

(a)

Jacobian size?

(b)

Angle after Newton's first step?

(c)

Voltage after Newton's first step?

Have paper and a calculator ready. Work each problem out by hand, then enter the answer. Your first try on each one counts toward your score.