S10 Power system analysis · Practice
Problem set 11: power system design problems
Problems dealt one at a time, with new numbers every time. The kinds you miss come back more often, and you can keep going as long as you like.
Check
A 500 MW load at power factor 0.95 is to be supplied over 300 km of line with 0.05 Ω/km per phase, losing at most 3%.
(a)
What is the lowest line voltage that meets the loss limit?
Write units the way you normally would: 1.5 kV, 1500 V and 0.0015 MV are the same answer.
Check
A 20 MW plant at power factor 0.7 is to be corrected to 0.98.
(a)
How large a capacitor bank?
Write units the way you normally would: 1.5 Mvar, 1500 kvar and 0.0015 Gvar are the same answer.
(b)
By how much does the supply current fall?
Check
A line of X = 0.6 pu between 1 pu buses must carry 1.8 pu at an angle of no more than 40°.
(a)
What series compensation does that require?
Check
A 34.5 kV substation transformer fed from a 5000 MVA source must keep the fault level on its secondary below 2000 MVA.
(a)
What is the least transformer reactance, in per unit on 100 MVA?
Check
A breaker at a 13.8 kV bus with a 2000 MVA fault level must interrupt with an asymmetry factor of 1.15.
(a)
What symmetrical fault current must it handle?
Write units the way you normally would: 1.5 kA, 1500 A and 0.0015 MA are the same answer.
(b)
And its asymmetrical interrupting current?
Check
A feeder carries at most 450 A of load. Its overcurrent relay picks up at 1.5 times that, through a CT with 1 A secondary rating, chosen as the smallest standard ratio of 100, 200, 400, 600, 800, 1200 or 1600 to 1 that covers the maximum load.
(a)
What primary pickup current is set?
Write units the way you normally would: 1.5 A, 1500 mA and 0.0015 kA are the same answer.
(b)
What secondary pickup current does the relay see?
Check
A line has 45 Ω of positive-sequence impedance; CT ratio 120, VT ratio 2000. Zone 1 covers 80% and zone 2 120% of the line.
(a)
What zone 1 reach, in secondary ohms?
Write units the way you normally would: 1.5 Ω, 1500 mΩ and 0.0015 kΩ are the same answer.
(b)
And zone 2?
Check
A 5 Mvar capacitor bank at a bus with a 250 MVA fault level is to be detuned to the 4.3th harmonic.
(a)
Where would it resonate without detuning?
(b)
What series reactor, as a percentage of the capacitor's reactance, tunes it to 4.3?
Check
A feeder's far end runs 7% low at peak. A regulator at the substation steps 0.625% per tap.
(a)
How many steps up bring the far end within 1% of nominal?
Check
A 10 GW system with H = 2 s must keep ROCOF below 0.5 Hz/s after losing 2 GW.
(a)
What ROCOF does the loss cause without help?
Write units the way you normally would: 1.5 Hz/s, 1500 mHz/s and 0.0015 kHz/s are the same answer.
(b)
How much fast frequency response must act at once to meet the limit (zero if none)?
Check
A radial line of X = 0.2 pu from a 1 pu source supplies load at power factor 0.9 lagging, with a required loadability margin of 30%.
(a)
What is the most load it may carry?
Check
A unit loses 200 dollars per hour running at 500 MW through a night of off-peak prices; restarting costs 400 dollars per start plus 60 dollars per MW of minimum output to warm up.
(a)
Above how many off-peak hours is shutting down cheaper?
Check
A 345 kV line of 200 km (b = 5 µS/km) gets shunt reactors at both ends that together absorb 75% of its charging, split equally.
(a)
What rating does each end's reactor need?
Write units the way you normally would: 1.5 Mvar, 1500 kvar and 0.0015 Gvar are the same answer.
A kind of problem counts as solid once you've got it right on the first try twice in a row. Back to the lesson · Practice every topic in S10